All borrow pits dug in the course of
construction and repair of buildings, roads, embankments, etc, shall be
deep and connected with each other in the formation of drain directed
towards the lowest level and properly stepped for discharge into a river
stream, channel or drain and no person shall create any isolated borrow
pit which is likely to cause accumulation of water which may breed
mosquitoes.